Evaluating products, processes and resources - SE MCQs

Evaluating products, processes and resources - SE MCQs


1) From the following give three major categories of risk,
1) Schedule risk
2) Project risk
3) Technical risk
4) Business risk

A) 1,2 and 3
B) 2,3 and 4
C) 1,2 and 4
D) 1,3 and 4
View Answer / Hide Answer

ANSWER: B) 2,3 and 4




2) The most common measure for correctness is.
A) Defects per KLOC
B) Errors per KLOC
C) $ per KLOC
D) Pages of documentation per KLOC
View Answer / Hide Answer

ANSWER: A) Defects per KLOC




3) Which metrics are derived by normalizing quality and/or productivity measures by considering the size of the software that has been produced.
A) Size oriented
B) Function-Oriented
C) Object-Oriented
D) Use-case-Oriented
View Answer / Hide Answer

ANSWER: A) Size oriented




4) What is the detailed sequence of steps that describes the interaction between the user and the application?
A) Scenario scripts
B) Support classes
C) Key classes
D) Subsystems
View Answer / Hide Answer

ANSWER: A) Scenario scripts




5) Which risks identify potential design, implementation, interface, verification and maintenance problems.
A) Project risk
B) Business risk
C) Technical risk
D) Schedule risk
View Answer / Hide Answer

ANSWER: C) Technical risk




6) The total number of distinct operator and operand occurrences measures are used in.
A) Lawrence theory
B) Halstead's theory
C) Kyburg, H. E.
D) Jech, T.
View Answer / Hide Answer

ANSWER: B) Halstead's theory




7) A quality metric that provides benefit at both the project and process level is.
A) Defect amplification
B) Defect removal efficiency
C) Measuring quality
D) All mentioned above
View Answer / Hide Answer

ANSWER: B) Defect removal efficiency




8) The degree to which the software performs its required function.
A) Correctness
B) Clarity
C) Completeness
D) Consistency
View Answer / Hide Answer

ANSWER: A) Correctness




9) Cohesion metrics and coupling metrics are metrics for which level design.
A) User interface design
B) Pattern-based design
C) Architectural design
D) Component-level design
View Answer / Hide Answer

ANSWER: D) Component-level design




10) Existing software can be acquired from a third party or from a past project.
A) Off-the-shelf components
B) Full-experience components
C) Partial-experience components
D) None of the above
View Answer / Hide Answer

ANSWER: A) Off-the-shelf components




11) Layout appropriateness according to sears is a worthwhile design metric for human/computer interfaces.
A) True
B) False
View Answer / Hide Answer

ANSWER: A) True




12) A defect amplification model is used to illustrate the generation and detection
of errors during the preliminary steps of a software engineering process.

A) Design
B) Detailed design
C) Coding
D) All mentioned above
View Answer / Hide Answer

ANSWER: D) All mentioned above




13) Hazard analysis focuses on the identification and assessment of potential hazards that can cause.
A) External problems
B) Internal problems
C) Both A & B
D) None of the above
View Answer / Hide Answer

ANSWER: A) External problems




14) Software risk impact assessment should focus on consequences that affecting.
A) Performance
B) Support and cost
C) Schedule
D) All mentioned above
View Answer / Hide Answer

ANSWER: D) All mentioned above




15) Software risk always involves which of these characteristics.
A) Uncertainty
B) Loss
C) Both A & B
D) None of the above
View Answer / Hide Answer

ANSWER: C) Both A & B




16) Threat is the probability that can attack a specific type and it also occur within a given time.
A) Yes
B) No
View Answer / Hide Answer

ANSWER: A) Yes




17) An effective risk management plan will need to address which of the following issues.
A) Risk avoidance
B) Risk monitoring
C) Contingency planning
D) All mentioned above
View Answer / Hide Answer

ANSWER: D) All mentioned above




18) Which of these activities is not one of the activities recommended to be performed by an independent SQA group.
A) Serve as the sole test team for any software produced
B) The tools and methods that support SQA actions and tasks
C) Software configuration management procedures
D) Organizational roles and responsibilities relative to product quality.
View Answer / Hide Answer

ANSWER: A) Serve as the sole test team for any software produced




19) Budget is not a section in the standard SQA plans that are recommended in IEEE.
C) True
D) False
View Answer / Hide Answer

ANSWER: C) True




20) Building an excellent product or system that no one really wants is.
A) Technical risk
B) Schedule risk
C) Business risk
D) Performance risk
View Answer / Hide Answer

ANSWER: C) Business risk


Post your comment