Prepare
Practice
Interview
Aptitude
Reasoning
English
GD
Placement
HR
Current affairs
Engineering
MCA
MBA
Online Test
Videos
Login
Online Practice Test
>
LoadRunner
« Previous
Next »
Scenario Group, SLA pane and Scenario Schedule Pane is related to
Options
- Control window
- Analysis window
- Vuser window
- All of these
CORRECT ANSWER : Control window
Discussion Board
Load Runner
Answer: Control window.
Solution: Control Window: Control window is used in the scenario group for defining service level agreement pane and scenario schedule pane for the scenario execution.
Analysis window: Analysis window is used to represent the summary report of the scenario execution.
Vuser window: Vuser window is used for selecting tool at the time of running the script in controller.
Therefore, Control window in the correct answer.
Rohit Srivastava 08-7-2014 03:28 AM
« Previous
Next »
Write your comments
*
*
Email must be in the form someone@domain.com
*
*
Enter the code shown above:
Please enter the code shown above
(Note: If you cannot read the numbers in the above image, reload the page to generate a new one.)
Related Content
Testing (25)
Testing (25)
Testing skills - Freshers (20)
Testing skills - Experienced (20)
Load Runner (30)
Manual testing (70)
QC (30)
QTP (30)
Selenium (30)
Winrunner (30)
SDLC (30)
Advertisement
▲