Prepare
Practice
Interview
Aptitude
Reasoning
English
GD
Placement papers
HR
Current affairs
Engineering
MCA
MBA
Online test
Login
Online Practice Test
>
Oracle 3
« Previous
Next »
A Scheduler program object is a collection of _________________ about what will be run by the Scheduler.
Options
- Data
- Metadata
- Procedure
- Jobs
CORRECT ANSWER : Metadata
Discussion Board
Scheduler
A scheduler program object is a collection of metadata about what will be run by the Scheduler. It includes information such as the name of the program object, program action (for example, a procedure or executable name), program type (for example, PL/SQL and Java stored procedures or PL/SQL anonymous blocks) and the number of arguments required for the program.
Prajakta Pandit 02-28-2017 12:29 AM
« Previous
Next »
Write your comments
*
*
Email must be in the form someone@domain.com
*
*
Enter the code shown above:
Please enter the code shown above
(Note: If you cannot read the numbers in the above image, reload the page to generate a new one.)
Related Content
Oracle (40)
Oracle (30)
Oracle (49)
Oracle (51)
Oracle (52)
Oracle DBA (29)
Oracle PLSQL (30)
Oracle Replication (20)
Oracle Architecture (20)
Oracle Transaction (20)
PLSQL (22)
PLSQL (24)
PLSQL (50)
Advertisement
▲