25 civil engineering interview questions and answers

          

Civil Engineering interview questions and answers


Part 1   Part 2   Part 3   Part 4   Part 5   Part 6

1.What are the steps involved in the concreting process, explain?
2. Describe briefly the various methods of concrete curing.
3. What do you understand by “preset” during the installation process of bridge bearings?
4. Why are steel plates inserted inside bearings in elastomeric bearings?
5. What reinforcements are used in the process of prestressing?

What are the steps involved in the concreting process, explain?

The major steps involved in the process of concreting are as follows:
1. Batching
2. Mixing
3. Transporting and placing of concrete
4. Compacting.

> Batching: The process of measurement of the different materials for the making of concrete is known as batching. batching is usually done in two ways: volume batching and weight batching. In case of volume batching the measurement is done in the form of volume whereas in the case of weight batching it is done by the weight.
> Mixing: In order to create good concrete the mixing of the materials should be first done in dry condition and after it wet condition. The two general methods of mixing are: hand mixing and machine mixing.
> Transportation and placing of concrete: Once the concrete mixture is created it must be transported to its final location. The concrete is placed on form works and should always be dropped on its final location as closely as possible.
> Compaction of concrete: When concrete is placed it can have air bubbles entrapped in it which can lead to the reduction of the strength by 30%. In order to reduce the air bubbles the process of compaction is performed. Compaction is generally performed in two ways: by hand or by the use of vibrators.

Describe briefly the various methods of concrete curing.

Curing is the process of maintaining the moisture and temperature conditions for freshly deployed concrete. This is done for small duration of time to allow the hardening of concrete. The methods that are involved in saving the shrinkage of the concrete includes:
(a) Spraying of water: on walls, and columns can be cured by sprinkling water.
(b) Wet covering of surface: can be cured by using the surface with wet gunny bags or straw
(c) Ponding: the horizontal surfaces including the slab and floors can be cured by stagnating the water.
(d) Steam curing: of pre-fabricated concrete units steam can be cured by passing it over the units that are under closed chambers. It allows faster curing process and results in faster recovery.
(e) Application of curing compounds: compounds having calcium chloride can be applied on curing surface. This keeps the surface wet for a very long time.

What do you understand by “preset” during the installation process of bridge bearings?

During the installation of bridge bearings the size of the upper plates is reduced to save the material costs. This process is known as preset. Generally the upper bearing plate comprises of the following components:
> Length of bearing
> 2 x irreversible movement.
> 2 x reversible movement.
The bearing initially is placed right in the middle point of the upper bearing plate. No directional effects of irreversible movement is considered. But since the irreversible movement usually takes place in one direction only the displaced direction is placed away from the midpoint. In such cases the length of the upper plate is equal to the length of the length of the bearing + irreversible movement + 2 x reversible movement.

Why are steel plates inserted inside bearings in elastomeric bearings?

In order to make a elastomeric bearing act/ function as a soft spring it should be made to allow it to bulge laterally and also the stiffness compression can be increased by simply increasing the limiting amount of the lateral bulging. In many cases in order to increase the compression stiffness of the bearing the usage of metal plates is made. Once steel plates are included in the bearings the freedom of the bulge is restricted dramatically, also the deflection of the bearing is reduced as compared to a bearing without the presence of steel plates. The tensile stresses of the bearings are induced into the steel plates. But the presence of the metal plates does not affect the shear stiffness of the bearings.

What reinforcements are used in the process of prestressing?

The major types of reinforcements used in prestressing are:
> Spalling Reinforcement: The spalling stresses leads to stress behind the loaded area of the anchor blocks. This results in the breaking off of the surface concrete. The most likely causes of such types of stresses are Poisson`s effects strain interoperability or by the stress trajectory shapes.
> Equilibrium reinforcements: This type of reinforcements are required where several anchorages exist where the prestressing loads are applied in a sequential manner.
> Bursting Reinforcements: These kinds of stresses occur in cases where the stress trajectories are concave towards the line of action of load. In order to reduce such stresses reinforcements in the form of bursting is required.

Part 1   Part 2   Part 3   Part 4   Part 5   Part 6



Write your comment - Share Knowledge and Experience

Discussion Board
Regarding of getting job opportunities.

My self Abdul azeez n I have just completed BE civil engineering I have very well field knowledge and well communication skill I wanted to join as a site engineer or structural design engineer in the well developed company for effectively learn and Grow.
My cell no:8095578042
and mail id:abdulazeezn69@gmail.com

Abdul azeez n 07-29-2015 04:53 AM

civil engg.

For the interview what kind of knowledge is required either civil engg. related or all in general.

prakash 07-6-2015 05:07 AM

b.tech from civil

My name is Shivraj go her I have done b.tech from civil in 2014 from Rajasthan and I have 2-3 month exp plz help me to get job and inform me on 9602830178

shivraj gocher 06-8-2015 12:46 AM

job

I completed my btech civil engineer can u tell me the job oputints my I'd is vharsha8@gmail.com
My number 8712299229

Harsha vadhab 05-27-2015 01:45 AM

btech civil

Please inform any civil engineering jobs under btech civil engineerning 99995051568

jomon fernandez 05-27-2015 01:38 AM

Jobs want

Am Sathish I completed in diploma in civil engineering in 2010, now I have 5years experience in site engineers planning quality control billing if any job at abroad countries please share me my number 9043258601 ,

Sathish kumar 05-20-2015 07:10 AM

regarding job

pls inform me the job information ...m the fresher my no is 7669080725

vivek pandey 05-16-2015 06:24 AM

about job profile

I'm completed engineering in 2014may, after that I started my career as lab assistant MDU university, afterwards I joined with a constructing company which construct a building tower with a complex mall now I having experience more than the 1.5years and trainee under RMC India limited

vikas kumar 05-11-2015 12:02 PM

civil engineering

Studied 4 yrs civilengineer in gccet

nizar ahamed 05-11-2015 03:09 AM

civil engineering interview qusetions

Tomorrow interview will be attending .please give me send the interview question answer in page 6

vamsikrishna 04-1-2015 09:18 AM

Quantity surveyinng questions and answers send me..

I have done diploma in 2011 and 3 years of experience in buildings,minor bridges ,Rcc drains , Heavy boundary wall,Earthwork railway staff Quators etc.

Ajay Sharma 03-30-2015 11:03 PM

civil

Completed diploma in civil engineering from institutions of civil engineers ICE (india) nd also having 6 months experience in building contract

Ansari Mubeen Mohammad Sajjad 03-27-2015 07:17 AM

building construction ??

I am civil engineer. 1.5 year experience. Job in Gurgaon Navy air force sector 33.

Shiv Kumar 03-24-2015 01:28 AM

job

i am civil engeenier.i have 1year experience in building construction and1year experience in highway bridge and road work my contact 9617209412

Umesh kumar patel 03-22-2015 01:07 AM

want job

Plz inform there is any job in civil & I have finished diploma engg. Civil in this yr...2015

Avinash Singh 03-11-2015 11:12 AM

i want job

please inform there is any job in civil and i have finished b.e civil in this year 2015 and my phone number 9698737840

s.magesh 03-4-2015 11:58 PM

applying job

please inform there is any job in civil and i have finished b.e civil in this year 2015.

s.magesh 03-4-2015 11:57 PM

want job

please inform thr s any job in civil...i hav finished
b.e civil..having 10 month exp... my no 9976459473

selva 02-27-2015 08:40 AM

job

please inform thr s any job in civil...i hav finished b.e civil..having 10 month exp...

selva 02-27-2015 08:38 AM

i am looking diplamo base jobs my no 8121778829

help two others

sanampudi sumanth babu 02-25-2015 04:05 PM

A civil job

You have know a diploma civil job please share me? Thanx

Biswaranjan jena 02-14-2015 02:48 PM

interview question and answer

looking civil diploma job in saudi.

jawaid Akhter 01-30-2015 10:59 AM

RCC

The transparent concepts are very important to satisfy the interviewer, listen carefully and hit the snawer

Muhammad Tariq 01-29-2015 12:04 AM

interview and civil side question and ans

Good and better knowlege looking

mahender bandhu 12-27-2014 01:31 PM

job

plz send me ol type of intervw qustions and qustn for quantity survy..

haseeb faisal 11-17-2014 12:16 PM

structur

Plz sentt me the dos related question

sahidur rahman 10-23-2014 05:58 AM

just for knowledge how to clear intervieww

its best option to take a idea how clear interview

Rahul goyal 07-26-2013 07:32 AM

just for knowledge how to clear intervieww

its best option to take a idea how clear interview

Rahul goyal 07-26-2013 07:20 AM

To get interview question's

To get interview questions

Saundane bapu govardhan 06-7-2013 09:08 AM

civil

lz send me da question aboutsteel structure

muhib 05-2-2013 02:16 AM

civil construction

civil construction work prepare to interview .

vipin kumar 02-16-2013 06:23 AM

 

 
 